Footings Checklist

For Footings, follow a checklist: backup, format, size/quality, output, spot-check.

Updated 2026-11-01About 3 minLocal test
Quick answer

For Footings, follow a checklist: backup, format, size/quality, output, spot-check. Footings depend on count/depth/frost/soil.

Why it matters

A fixed checklist prevents skipping the critical step.

Count.

Step by step

  1. Check material/area/height/railing/stairs/permits.
  2. Separate materials/labor/footings/railing/stairs/removal.
  3. Get 2-3 quotes; confirm material/area/warranty.
  4. Contract states scope/permits/payment/warranty.

Common mistakes

  • Unit price only, not area/height/railing.
  • Ignoring footings/permits/HOA.
  • Not confirming old deck removal.
  • No warranty/payment terms.

Checklist

  • Material/area/height/railing/stairs.
  • Materials/labor/footings/removal.
  • Permits/HOA/survey/drainage.
  • Warranty/payment/contract.
  • Budget/maintenance/staining.

Key facts

  • Count.
  • Depth.
  • Soil.

FAQ

What is a Footings checklist?

For Footings, follow a checklist: backup, format, size/quality, output, spot-check. Footings depend on count/depth/frost/soil.

How long does it take?

Usually 1-3 minutes; for intermittent issues, run 30 seconds and retest elsewhere.

Is data uploaded?

Runs locally and does not upload video/audio; extensions may still read the page.